7 Key Components of a Successful 1 MW Solar Project

2 min read
WhatsApp share
Twitter share
LinkedIn share
Instagram share
Facebook share
7 Key Components of a Successful 1 MW Solar Project

A 1 MW solar power project meets high energy demands and is a practical and scalable sustainable solution. This amount of solar power lights up about 2,500-3,000 solar panels, based on their wattage. These projects can power manufacturing units, cold storage & warehouses, malls & corporate buildings.

Relevance of Site Selection

For site selection, factors such as sunlight availability and the environmental impact assessment are important. About 4-5 acres of sunlight is required for a 1 MW solar project.

Feasibility Studies

A feasibility study of various locations for solar energy generation potential includes studying solar radiation, calculating the levelized cost of energy, and evaluating the long-term project viability.

Approvals

Before setting up any solar power projects in India, it is mandatory to get the required approval from DISCOM and ensure that land use approvals have been obtained. ISO certification assures the quality of service.

Technology Usage

Technology plays an important role, and choosing the right photovoltaic panel depends on the cost and efficiency. To achieve 1 MW capacity, the number of panels required varies based on wattage

Financing

For financing a solar power project, it is vital to outline funding strategies such as equity, government subsidies, green bonds, and Power Purchase Agreements (PPAs). The cost of a 1MW solar power plant in India is Rs 4–5 crores, including the cost of solar panels, solar inverters and other vital components like combiners & junction boxes, and the cost of erection systems.

Project Execution

From sourcing the right materials to installation, commissioning and post-commissioning support, every phase depends on on-time project execution. End-to-end, successful project execution requires continuous monitoring and post execution follow up.

Grid Integration and Maintenance

Integrating solar power into the electrical grid is a multifaceted process that includes assessment of grid capacities, installation of suitable inverter technologies, adoption of power electronics, utilisation of smart meters, incorporation of energy storage solutions, and securing necessary permits, which is followed by maintenance considerations such as regular inspections, performance monitoring, upgrades and retrofitting, and grid resilience planning to ensure safety from harsh weather conditions and other emergencies.

The Bottom Line

Developing 1 MW of solar power projects is a challenging yet rewarding endeavour. With innovation and collaboration, solar energy can fuel sustainable growth. Solar power costs 18% less than coal-fired electricity and stands at ₹4.34 per kWh, proving to be a viable alternative that is cost-efficient and sustainable.